Artist's rendering of Site C dam on Peace River. The B.C. government is expected to decide this year whether to start construction in 2015.

Artist's rendering of Site C dam on Peace River. The B.C. government is expected to decide this year whether to start construction in 2015.

Don’t rush Site C dam, mayor urges

The community most affected by the proposed third dam on the Peace River is urging the B.C. government to get more answers

The community most affected by the proposed third dam on the Peace River is urging the B.C. government to get more answers before going ahead.

Hudson’s Hope Mayor Gwen Johansson made the rounds of Vancouver media this week, backed up by a consultant’s report that questions the need for the $8 billion project assessed by a federal-provincial joint review panel this spring.

Energy Minister Bill Bennett has said the cabinet will consider the federal panel’s report and decide this fall whether to issue permits to allow construction to begin in 2015.

The report by planning and engineering consultants Urban Systems reinforces many of the doubts expressed by the joint review panel, including the cost of the dam and the alternatives available to meet anticipated power demand.

Those options include upgrading the gas-fired Burrard Thermal generating station in the Lower Mainland. The federal review estimated that upgrade could be done for the $1 billion that BC Hydro would pay in interest on the debt generated by the Site C dam.

Urban Systems looked at other options, including geothermal, solar, new natural gas generation and “microgrids” with distributed power from solar or other small sources.

Johansson said the dam would flood more productive farmland in the Peace River valley, and commit the region to another big power source for 100 years at a time when small, distributed sources are becoming competitive.

“Hudson’s Hope has done its bit,” Johansson told CBC radio Wednesday. “We have suffered the consequences of the Bennett Dam and Peace Canyon dam. If there are alternatives I think we should have a really close look at them.”

The Urban Systems report compares Site C’s estimated power cost of $110 per megawatt hour with a new gas cogeneration plant in Calgary that is expected to cost $30 per megawatt hour.

Johansson echoed the joint review panel and NDP leader John Horgan’s call for Site C to be reviewed by the B.C. Utilities Commission, to assess its cost estimates and BC Hydro’s projections for future electricity demand.

 

Get local stories you won't find anywhere else right to your inbox.
Sign up here

Just Posted

A woman wearing a face mask to curb the spread of COVID-19 uses walking sticks while walking up a hill, in New Westminster, B.C., on Sunday, November 29, 2020. THE CANADIAN PRESS/Darryl Dyck
Interior Health reports 83 more COVID-19 infections overnight

46 cases are now associated with a COVID-19 community cluster in Revelstoke

What's happening at the Cranbrook Public Library
What’s on at the Cranbrook Public Library

Mike Selby The Library is now open with extended hours (with some… Continue reading

The City of Cranbrook is warning the public that the lake at Idlewild Park is not currently safe to skate on after someone cleared the ice over the weekend. (Submitted file)
Idlewild Lake still not safe for skating: City of Cranbrook

Ice on area waterbodies is currently quite thin, and not yet ready for recreation

A man wearing a face mask to prevent the spread of COVID-19 walks past a mural in Vancouver on Monday, Nov. 30, 2020. THE CANADIAN PRESS/Marissa Tiel
212 new COVID-19 cases in Interior Health over the weekend

A total of 490 cases remain active; 15 in hospital

File Photo
Missing hunter found dead in South Country

A hunter was reported as overdue on Nov. 29, and was found deceased on Nov. 30 following an RCMP and SAR operation

A tongue-in-cheek message about wearing a face mask to curb the spread of COVID-19 on a sign outside a church near Royal Columbia Hospital, in New Westminster, B.C., on Sunday, Nov. 29, 2020. THE CANADIAN PRESS/Darryl Dyck
B.C.’s COVID-19 infection count climbs back up to 656

20 more people in hospital, active cases still rising

The Walking Curriculum gets students outside and connecting with nature. (Amanda Peterson/Special to S.F. Examiner)
‘Walking Curriculum’ crafted by SFU professor surges in popularity

The outdoor curriculum encourages students to connect with the natural world

THE CANADIAN PRESS/Nathan Denette
B.C. researchers launch study to test kids, young adults for COVID-19 antibodies

Kids and youth can often be asymptomatic carriers of the novel coronavirus

A sign is seen this past summer outside the Yunesit’in Government office west of Williams Lake reminding visitors and members to stay safe amid the COVID-19 pandemic. (Rebecca Dyok photo)
B.C. First Nation leaders await privacy commissioner decision on COVID-19 information

Release of life-saving data cannot wait, says coalition of First Nations

Cannabis bought in British Columbia (Ashley Wadhwani/Black Press Media)
Is it time to start thinking about greener ways to package cannabis?

Packaging suppliers are still figuring eco-friendly and affordable packaging options that fit the mandates of Cannabis Regulations

Join Black Press Media and Do Some Good
Join Black Press Media and Do Some Good

Pay it Forward program supports local businesses in their community giving

MLA Jennifer Whiteside is B.C.’s new minister of education. She is speaking out against Chilliwack school trustee Barry Neufeld and asking him to resign. (Black Press)
New education minister calls on Chilliwack trustee to resign

Whiteside echoes former minister’s promise to look at options to remove Barry Neufeld

Most Read